A.W.P.D.-42
REQUIREMENTS FOR AIR ASCENDANCY

Tab B
Operating Plans and Forces Required
B-1-a Air Offensive - Europe

European Theatre - Appendix G-VI Electric Power

LIST OF TARGETS

I. RUHR AND RHINELAND AREA

No.

Place

Name of Plant

Capacity KW

1.

Knapsack (Nr. Koln)

Goldenberg

500,000

2.

Quadrath (Nr. Koln)

Fortuna I and II

200,000

3.

Stockum

Gersteinwerk

100,000

4.

Dusselldorf

Reisholz

115,000

5.

Hattingen

Gemeinschaft

120,500

6.

Essen

Karnap

220,000

7.

Herdecke

Koepchenwerk

140,000

8.

Brauweiler (Nr. Koln)

Brauweiler

Switching & Transformer Station

II. BERLIN AREA

No.

Place

Name of Plant

Capacity KW

9.

Berlin

Klingenberg

270,000

10.

Berlin

Westcroft

220,000

11.

Berlin

Charlottenberg

54,000

12.

Berlin

Spandau

49,400 & Switching Transformer Station

13.

Zchornewitz

Golpa

440,000

14.

Trattendorf

Trattendorf

160,000

15.

Lauta

Lauta

130,000

16.

Finkenheerd

Finkenheerd

290,000

17.

Berlin

Friedrichsfelde

Switching & Transformer Station

III. SOUTHERN AREA

No.

Place

Name of Plant

Capacity KW

18.

Schwandorf

Schwandorf

120,000

19.

Walchenseewerk

Walchenseewerk

125,000

20.

Nurnberg

Nurnberg

59,600 & Switching & Transformer Station

21.

Mannheim

Grosskraftwerk

130,000

22.

Rheinau

Rheinau

Switching & Transformer Station

23.

Aschaffenburg

Aschaffenburg

Switching & Transformer Station

24.

Karlsfeld (Nr. Munich)

Karsfeld

Switching & Transformer Station

IV. NORTHERN AREA

No.

Place

Name of Plant

Capacity KW

25.

Hamburg

Neuhof

130,000

26.

Hamburg

Tiefstack

90,000

27.

Hamburg

Schulau

50,000

28.

Lubeck

Merrenwyck

50,000

29.

Hamburg

Harburg

Switching & Transformer Station

30.

Hannover

Lehrte

Switching & Transformer Station

31.

Stettin

Pommerandorf

150,000

V. CENTRAL AND SOUTHEASTERN AREA

No.

Place

Name of Plant

Capacity KW

32

Bohlen

Bohlen

238,000

33

Espenhain

Espenhain

150,000

34

Borken

Borken

145,000

35.

Grosskayna

Grosskayna

56,000

36.

Harbke

Harbke

150,000 Approx

37.

Hirschfelde

Hirschfelde

145,000

NOTES:

1. Electric power is not a commodity which can be satisfactorily treated in terms of the total capacity of the country and must be considered in terms of areas. The total capacity of all of the plants within any one of the areas does not represent a high percentage of the total installed plant capacity in the whole of Germany, but it does represent a very high proportion of the capacity of the plants within the areas concerned.

2. The selection of the targets has been made after a technical examination of the power network, and the targets hot only include the major generating stations but also those switching and transformer stations through which external supplies might be imported to make up the deficiency due to the destruction of the power plants.

3. If all the plants selected in any one group are successfully destroyed, very wide areas will be completely denuded of electric power supplies, and if all five areas are dealt with, the electric power supply system in the whole of Germany would break down. This would not only have the effect of bringing a very large portion of industry to a standstill, but would also have an enormous effect on morale.

LOCATION OF TARGETS

BOMBER FORCE REQUIRED

1. DESCRIPTION OF TARGETS

An electric power station comprises 3 main units - the Turbine House, Boiler House and Switch House. The plant in the Turbine House, if destroyed, may take anything from 18 months to 2 years to replace. Boiler Plant may take an equal time to repair, but it is unlikely that a complete boiler unit will be destroyed but will be only damaged and repairs can probably be made in from 9 months to one year. Plant in the Switch House may take from 6 months to a year to replace, but temporary repairs can often be made to continue the operation of the Power House whilst the switchgear is being repaired. Hence, the Turbine House is considered to be the main objective. The sizes of this house may vary from plant to plant, but a good average for a large capacity station is about 400’ x 100’.

2. NUMBER OF DIRECT HITS AND TYPE OF BOMBS REQUIRED

It is considered that at least 6 direct hits are required upon the Turbine House in order to effectively destroy the generating capacity of the station. In order to obtain this number of hits on the comparatively small area of 400' x 100’, it is inevitable that many of the bombs will fall on the adjacent Boiler House and Switch House.

3. NUMBER OF SORTIES AND BOMBER FORCE REQUIRED

Based upon detailed calculations taking into account all operational factors involved in making attacks against highly defended targets, with appropriate allowances for probabilities, aiming errors, losses, etc., etc., and allowing for the fact that with the weight of attack proposed the destruction will be such that the plant will take more than 6 months to repair and, hence, that no further attacks will be required it appears that it will be necessary in order to deal with the 37 plants to have:—

13,449 SORTIES

In order to carry out these sorties in 33 operational days a force of:-

452 BOMBERS

must be set-up.