REQUIREMENTS FOR AIR ASCENDANCY Tab B European Theatre - Appendix G-VI Electric Power |
I. RUHR AND RHINELAND AREA |
|||
No. |
Place |
Name of Plant |
Capacity KW |
1. |
Knapsack (Nr. Koln) |
Goldenberg |
500,000 |
2. |
Quadrath (Nr. Koln) |
Fortuna I and II |
200,000 |
3. |
Stockum |
Gersteinwerk |
100,000 |
4. |
Dusselldorf |
Reisholz |
115,000 |
5. |
Hattingen |
Gemeinschaft |
120,500 |
6. |
Essen |
Karnap |
220,000 |
7. |
Herdecke |
Koepchenwerk |
140,000 |
8. |
Brauweiler (Nr. Koln) |
Brauweiler |
Switching & Transformer Station |
II. BERLIN AREA |
|||
No. |
Place |
Name of Plant |
Capacity KW |
9. |
Berlin |
Klingenberg |
270,000 |
10. |
Berlin |
Westcroft |
220,000 |
11. |
Berlin |
Charlottenberg |
54,000 |
12. |
Berlin |
Spandau |
49,400 & Switching Transformer Station |
13. |
Zchornewitz |
Golpa |
440,000 |
14. |
Trattendorf |
Trattendorf |
160,000 |
15. |
Lauta |
Lauta |
130,000 |
16. |
Finkenheerd |
Finkenheerd |
290,000 |
17. |
Berlin |
Friedrichsfelde |
Switching & Transformer Station |
III. SOUTHERN AREA |
|||
No. |
Place |
Name of Plant |
Capacity KW |
18. |
Schwandorf |
Schwandorf |
120,000 |
19. |
Walchenseewerk |
Walchenseewerk |
125,000 |
20. |
Nurnberg |
Nurnberg |
59,600 & Switching & Transformer Station |
21. |
Mannheim |
Grosskraftwerk |
130,000 |
22. |
Rheinau |
Rheinau |
Switching & Transformer Station |
23. |
Aschaffenburg |
Aschaffenburg |
Switching & Transformer Station |
24. |
Karlsfeld (Nr. Munich) |
Karsfeld |
Switching & Transformer Station |
IV. NORTHERN AREA |
|||
No. |
Place |
Name of Plant |
Capacity KW |
25. |
Hamburg |
Neuhof |
130,000 |
26. |
Hamburg |
Tiefstack |
90,000 |
27. |
Hamburg |
Schulau |
50,000 |
28. |
Lubeck |
Merrenwyck |
50,000 |
29. |
Hamburg |
Harburg |
Switching & Transformer Station |
30. |
Hannover |
Lehrte |
Switching & Transformer Station |
31. |
Stettin |
Pommerandorf |
150,000 |
V. CENTRAL AND SOUTHEASTERN AREA |
|||
No. |
Place |
Name of Plant |
Capacity KW |
32 |
Bohlen |
Bohlen |
238,000 |
33 |
Espenhain |
Espenhain |
150,000 |
34 |
Borken |
Borken |
145,000 |
35. |
Grosskayna |
Grosskayna |
56,000 |
36. |
Harbke |
Harbke |
150,000 Approx |
37. |
Hirschfelde |
Hirschfelde |
145,000 |
NOTES: 1. Electric power is not a commodity which can be satisfactorily treated in terms of the total capacity of the country and must be considered in terms of areas. The total capacity of all of the plants within any one of the areas does not represent a high percentage of the total installed plant capacity in the whole of Germany, but it does represent a very high proportion of the capacity of the plants within the areas concerned. 2. The selection of the targets has been made after a technical examination of the power network, and the targets hot only include the major generating stations but also those switching and transformer stations through which external supplies might be imported to make up the deficiency due to the destruction of the power plants. 3. If all the plants selected in any one group are successfully destroyed, very wide areas will be completely denuded of electric power supplies, and if all five areas are dealt with, the electric power supply system in the whole of Germany would break down. This would not only have the effect of bringing a very large portion of industry to a standstill, but would also have an enormous effect on morale. |
1. DESCRIPTION OF TARGETS
An electric power station comprises 3 main units - the Turbine House, Boiler House and Switch House. The plant in the Turbine House, if destroyed, may take anything from 18 months to 2 years to replace. Boiler Plant may take an equal time to repair, but it is unlikely that a complete boiler unit will be destroyed but will be only damaged and repairs can probably be made in from 9 months to one year. Plant in the Switch House may take from 6 months to a year to replace, but temporary repairs can often be made to continue the operation of the Power House whilst the switchgear is being repaired. Hence, the Turbine House is considered to be the main objective. The sizes of this house may vary from plant to plant, but a good average for a large capacity station is about 400’ x 100’.
2. NUMBER OF DIRECT HITS AND TYPE OF BOMBS REQUIRED
It is considered that at least 6 direct hits are required upon the Turbine House in order to effectively destroy the generating capacity of the station. In order to obtain this number of hits on the comparatively small area of 400' x 100’, it is inevitable that many of the bombs will fall on the adjacent Boiler House and Switch House.
3. NUMBER OF SORTIES AND BOMBER FORCE REQUIRED
Based upon detailed calculations taking into account all operational factors involved in making attacks against highly defended targets, with appropriate allowances for probabilities, aiming errors, losses, etc., etc., and allowing for the fact that with the weight of attack proposed the destruction will be such that the plant will take more than 6 months to repair and, hence, that no further attacks will be required it appears that it will be necessary in order to deal with the 37 plants to have:—
13,449 SORTIES
In order to carry out these sorties in 33 operational days a force of:-
452 BOMBERS
must be set-up.